Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$29 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
D

Non-compliance with Power Strip Regulations

Bronx, New York Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure the use of approved UL listed power strips, as observed during a life safety code survey. On the third floor lounge area, a Christmas tree was found plugged into an unapproved power strip. This observation was made on one out of four units, indicating non-compliance with specific NFPA codes.

Plan Of Correction

Plan of Correction: Approved December 19, 2024 Immediate Corrective Action: The Maintenance Director and Facility Supervisor on 12.03.2024 removed the unapproved power strip on the third floor of the facility. A Christmas tree was plugged into the extension cord and as such, required a direct outlet. The Maintenance team rectified this deficiency as of 12.04.2024. The Senior Administrator and Quality Improvement team issued a memorandum on 12.03.2024 to the Maintenance Director and facility team regarding power strips in accordance to CMS K-Tag 920. Identification of Others Potentially Affected: The facility respectfully submits all residents were potentially affected by this practice. System Changes to Prevent Recurrence: The Maintenance team are now mandated to have biannual Life Safety Code checklist in-services. The maintenance and facilities supervisor will conduct daily (M-F) maintenance walk-through ensuring existing UL power strips are installed as outlined in K-Tag-920. Quality Assurance Monitoring: The Facility supervisor will audit the daily test logs, monthly test reports and complete the quarterly internal tracker -K category to ensure compliance with the required Life Safety Code lists. Any deficiency identified for K-Tag 920 will be rectified immediately and subjected to quarterly internal audit by the quality assurance unit until substantial measures are enacted. Responsible Party: Facility Supervisor

Long-term care team reviewing survey readiness and plan of correction

We Help Long-Term Care Teams Stay Survey-Ready

We process and analyze inspection reports and plan of correction using AI to extract insights and trends so providers can improve care quality and stay ahead of compliance risks.

Discover our solutions:

An unhandled error has occurred. Reload 🗙