Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$29 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0511
F

Noncompliance with Gas and Electrical Safety Standards

Allen Park, Michigan Survey Completed on 06-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that equipment using gas or gas-related piping complied with NFPA 54 and that electrical wiring and equipment complied with NFPA 70. During observations, surveyors found two ceiling-mounted light sockets with the bases of broken light bulbs still inside the sockets in the Business/Activities Supply Cage. Combustible stock items were stored within three feet of electrical panels in both the Laundry and Sump Pump Room. Additionally, a Greenfield conduit was found displaced, exposing inner wires at the plug to the relay in the back of a boiler in the North Boiler Room. These deficiencies were confirmed through interviews with the facility Maintenance Director and the Corporate Operations Director at the time of observation.

Plan Of Correction

K 511 Element # 1 The (2) ceiling mounted light sockets in the Business/activities Supply cage with broken light bulbs, were repaired. The items stored in the Laundry Room within 3 of the electrical panel were removed. The Greenfield Conduit in the North Boiler Room was repaired. The combustible items within 3 of electrical panel in the sump pump room were removed. Element # 2 Current residents have the potential to be affected by the deficient practice. The facility's electrical equipment was evaluated to ensure proper maintenance. Any deficiencies found were corrected. Element # 3 The Maintenance Department was re-educated on properly maintained electrical equipment. Element # 4 The Administrator and/or designee will conduct random audits of the emergency preparedness plan x1/week for 1 month, then weekly for 1 month and then monthly for 3 months to ensure substantial compliance with a geographically specific risk assessment. Results of the audits will be brought to the QAPI committee. The Administrator is responsible for sustained compliance. Date of Compliance: 7/8/2025

Long-term care team reviewing survey readiness and plan of correction

We Help Long-Term Care Teams Stay Survey-Ready

We process and analyze inspection reports and plan of correction using AI to extract insights and trends so providers can improve care quality and stay ahead of compliance risks.

Discover our solutions:

An unhandled error has occurred. Reload 🗙