K0521 K521: Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.
F

Lack of Documentation and Final Inspection for Newly Installed Boiler

Maple Valley Nursing HomeMaple City, Michigan Survey Completed on 06-12-2025

Summary

The facility failed to ensure that its heating, ventilation, and air conditioning (HVAC) system was in compliance with regulatory requirements, specifically section 9.2. During an observation, it was found that a newly installed boiler heating unit lacked manufacturer information and proof of a State of Michigan boiler inspection. The office manager was unable to confirm whether the necessary corrections identified by the state boiler inspector during a previous visit had been completed, and only had limited information about the inspector. Further confirmation from the State of Michigan boiler inspector indicated that the required corrections on the new boiler installation had not yet been completed, and a final inspection had not been requested.

Plan Of Correction

Address how corrective action will be accomplished for those residents found to have been affected by the deficient practice: The boiler was inspected and did not pass. Contractor has made the required repairs and is calling to schedule another inspection as soon as possible. Once the state boiler inspection has been completed, the local building department will perform their inspection. I personally spoke with the state boiler inspector on Friday, as the contractor is not fulfilling his responsibilities of completing this project and scheduling the inspection. The inspector said he would be able to come on Monday, June 30 or July 1, but I have not heard back with a confirmed date or time. I am unable to force the contractor or inspector to get this taken care of in a timely manner, so I do not have firm dates that it will be inspected or approved. Address how the facility will identify other residents having a potential to be affected by the same deficient practice: The residents are not affected by this deficient practice. The boiler is not in use as it is not heating season and operates as designed when needed. Address what measures will be put into place or systemic changes made to ensure that the deficient practice will not reoccur: This contractor will not be used again in the future. Maintenance Director will ensure any future contractors will complete permits and inspections prior to being paid in the future. Indicate how the facility plans to monitor its performance to make sure that solutions are sustained: Maintenance director will monitor weekly and maintain communication with contractor to ensure the inspections are completed. Will be discussed at quarterly QAPI meetings.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0521 citations in Ohio
Lack of Required Inspection and Testing Documentation for Fire Dampers
F
K0521 K521: Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.
Short Summary

Surveyors determined that the facility did not maintain required documentation showing that fire dampers had been inspected and tested in accordance with NFPA 101, NFPA 90A, and NFPA 80 standards. During record review, no inspection or testing records were produced despite multiple requests, even though fire dampers were observed throughout the building. The Maintenance Director confirmed that the documentation was not available, and this deficiency had the potential to affect all 69 residents.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

99.5% of Ohio facilities received at least one citation during their inspection in the last 12 months.Will yours be survey-ready?

Surveyors issued 64 serious citations across Ohio in the last 12 months. See exactly what they're citing.

Get ready for your next survey

See what surveyors are citing in Ohio and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙